Office building 14 on the EUREF-Campus

Office building No.14 in the EUREF-Campus 'Egg' without CO2

Task

Construction of an office building in the EUREF Campus, Schöneberg, Berlin. The new building comprises of a singlestorey underground garage, a ground floor with a central entrance area and further eight upper floors for flexible office use.

The elliptical building structure features a total rental area of approx.         5,272 m². The building is planned and constructed in compliance with the LEED "Gold" certification level. The basis is the LEED 2009 CS certification system (Core and Shell Development).

Heat and cold energy supply of the EUREF Campus occurs in a CO2-neutral manner via a biogas-fired CHP (cogeneration plant) in combination with peak load boilers and turbo chillers. These are constructed and operated by GASAG as a contractor.

Customer

DENKMALplus Beteiligungsgesellschaft mbH & Co. Haus 14 KG

Services

  • Service phases from 1 to 4, 6, 7 and 8
  • System groups from 1 to 8

Project period

from 2014 to 2015