The system includes fuel delivery and storage areas, an EBS boiler with grate firing, a flue gas cleaning unit, an extraction condensing turbine with a closed water-steam circuit and an air-cooled condenser.
Substitute fuels (EBS) for thermal power plant in Rostock
Planning of a thermal power plant for thermal waste processing
Task
Technical data
- Electrical capacity: 20 MW
- Firing capacity: 98 MW
- team quantity: 100 t/h
- Live steam parameter: 42 bar/ 405°C
- EBS quantity: 180.000 t/a
Customer
Vattenfall Europe PowerConsult GmbH
Services
- General planning including conceptual design and approval planning
- tendering and contracting
- controlling
Project period
from 2005 to 2009